top of page

TRACK IT. WIPE IT CLEAN. USE IT AGAIN.

The My Skills Books I Can Wash My Face Practice & Progress Tracker is a reusable acrylic task analysis chart designed to make face-washing practice, data collection, and progress tracking easier for parents, teachers, behavior therapists, and other professionals.

Write directly on the durable acrylic surface using compatible dry-erase or wet-erase markers. Record performance across all 12 face-washing steps, add notes, use the built-in reward chart, then wipe the board clean and reuse it for the next practice session.

KEY FEATURES

REUSABLE WRITE-ON TASK ANALYSIS CHART: Replace disposable tracking sheets with one durable, reusable tool. Write directly on the acrylic surface with compatible dry-erase or wet-erase markers, record performance, wipe clean, and use again for ongoing face-washing practice and progress tracking.

12-STEP FACE-WASHING TASK ANALYSIS: Face washing is broken into 12 individual steps, including turning on the faucet, wetting hands, applying water to the face, getting soap, applying and lathering soap, washing the face, rinsing or wiping away soap, turning off the faucet, getting a towel, and drying the face.

FLEXIBLE ROUTINE OPTIONS: The task analysis accommodates different face-washing preferences by allowing water or a wet washcloth to be used for the rinsing portion of the routine. This makes the tracker adaptable while maintaining a clear step-by-step sequence.

QUICK C-I-P DATA COLLECTION: Track each step using C = Correct, I = Incorrect, and P = Prompted. The simple format makes it easy to record performance while face washing is being practiced and identify specific steps that may require additional teaching, practice, or support.

TRACK THE ROUTINE STEP BY STEP: Rather than recording face washing as one completed or incomplete skill, the task analysis allows each component to be tracked separately. See where the learner is progressing and where prompting or additional practice may still be needed.

DATA + NOTES + REWARD CHART IN ONE TOOL: Keep the complete face-washing task analysis, performance data, observations, and reinforcement together. The tracker combines C-I-P data columns, a spacious notes section, an easy-reference data key, and a built-in 7-star reward chart.

DESIGNED FOR PARENTS & PROFESSIONALS: A practical personal hygiene tracking tool for parents, teachers, behavior therapists, behavior analysts, special education professionals, therapists, caregivers, and other related professionals supporting hygiene, adaptive functioning, independence, and daily living skills.

USE WHERE THE SKILL IS PRACTICED: Keep the tracker near the sink or use it in bathrooms, classrooms, clinics, ABA programs, therapy spaces, or other learning environments so performance can be recorded while the face-washing routine is practiced.

LIGHTWEIGHT & EASY TO TAKE WITH YOU: The compact acrylic board is lightweight and easy to carry between locations, making it convenient for families and professionals supporting the same personal-care routine across multiple environments.

DURABLE ACRYLIC FOR REPEATED USE: The acrylic construction provides a sturdy write-on surface for repeated data collection. Unlike individual paper forms, the same tracker can be wiped clean and reused as face-washing skills are practiced over time.

CLEAR, EASY-TO-READ DESIGN: High-definition, vibrant printing keeps all 12 task steps, C-I-P tracking columns, notes area, data key, reward chart, and routine options clear and easy to reference.

WOODEN STAND INCLUDED: Includes a sustainably sourced wooden stand so the tracker can remain upright, visible, and within easy reach when needed.

PART OF THE MY SKILLS BOOKS COLLECTION

The I Can Wash My Face Practice & Progress Tracker can be used independently or paired with I Can Wash My Face and the My Skills Books Face Washing Visual Task Analysis.

The book introduces the face-washing routine, the Visual Task Analysis provides an illustrated step-by-step reference, and the Practice & Progress Tracker provides a reusable way to record performance and monitor progress while the skill is practiced.

Learn more about My Skills Books at myskillsbooks.com.

PRODUCT DETAILS

• Reusable face-washing task analysis and progress tracker
• Durable write-on acrylic surface
• Use with compatible dry-erase or wet-erase markers
• Wipe clean and reuse for future practice sessions
• 12 detailed face-washing task steps
• Accommodates water or wet washcloth routine preferences
• C = Correct, I = Incorrect, P = Prompted tracking system
• Large notes section for observations
• Built-in 7-star reward chart
• High-definition, vibrant printing
• Lightweight and portable
• Size: 7.9 x 11.8 inches
• Sustainably sourced wooden stand included
• Useful for parents, teachers, behavior therapists, behavior analysts, special education professionals, therapists, caregivers, and related fields
• Suitable for home, school, clinic, ABA, therapy, and other learning environments
• Coordinates with I Can Wash My Face and other My Skills Books resources

CARE INSTRUCTIONS

Clean with water or mild soap and a soft cloth.

ONE BOARD. REPEATED PRACTICE. EASY PROGRESS TRACKING.

A reusable face-washing task analysis that keeps step-by-step data collection, notes, and reinforcement together in one durable tool. Write, track, wipe clean, and use it again.

Washing Face Task Analysis Progress Chart - Writable & Reusable Acrylic Board

$29.99Price
Quantity

    ©2019-2026 by My Skills Books. All Rights Reserved. USA.

    My Skills Books | Enjoy. Learn. Read.

    • Facebook
    • Instagram
    bottom of page